Pre - approval public notice of the Environmental Impact Report for the factory building constructio

2024-07-24

according toMeasures for Public Participation in Environmental Impact AssessmentBefore a construction unit submits an environmental impact report to the competent ecological and environmental authority for approval, it shall make public the full text of the proposed environmental impact report and public participation instructions through an online platform.The project is nowFull text of the environmental impact report and instructions for public participationIt is open to the public and people from all walks of life are welcome to provide valuable suggestions on project construction from the perspective of environmental protection.

Project Name:Zhuhai Federal Animal Health Co., Ltd. Factory Construction Project

Project galleryNortheast side of Pingwan 3rd Road, Petrochemical Zone, Nanshui Town, Jinwan District, Zhuhai City

Project Overview:The project covers an area of66691.26square meters, the total investment is50000The company is mainly engaged in the production of veterinary drugs and is expected to produce ceftiofur sodium/Ceftiofur Hydrochloride500t/a, Cefquinome sulfate30t/a, Cefuroxime sodium and its preparations1t/aCefuroxime1t/a, Cefpirine acid2t/a, Amoxicillin Sodium300t/aBenzathine aspirin1t/a, Flunixin meglumine150t/aTaidiluosin3t/aEnrofloxacin/Enrofloxacin Hydrochloride600t/aGamithromycin1t/a, Tulathromycin1t/a, Imidazolidine dipropionate1.5t/aNicarbazine2t/aTilmicosin phosphate2t/aFlurellana1t/aFeibantel1t/aLufenuron1t/aMethoxyprene1t/a, penicillin1t/aToltrazuril2t/aTocinib2t/aMavacoxib2t/a2-Mercaptobenzothiazole (2-MBT343t/a, Potassium Fluoborate456t/a, crude chlorine97t/a

Construction unit:Zhuhai Federal Animal Health Co., Ltd.

Unit Address:Xintong Road, Nanshui Town, Jinwan District, Zhuhai City139No. Juxian Lane317house3No. (centralized office area)

Contact:Liu Shuo

Contact Number:15819813637

Email:liushuo@tul.com.cn

appendix:Zhuhai Federal Animal Health Co., Ltd. Factory Construction ProjectEnvironmental impact report, public opinion questionnaire, public participation instructions (link:https://pan.baidu.com/s/1hU5vfpS-m6z8nOQ2fJ7F8g Extraction code:4213

       Publication date:2024Year7moon24day


share
Write a Review...